The Contractor shall provide all the: tools, parts, materials, equipment, transportation, and labor of the Facilitate Other Maintenance (FOM) Cage w/Install at Bldg 149 for the Maintenance Support Group (AMXG) at Robins Air Force Base (AFB), Georgia.
Please see the attached files for additional information.
Update: 16 October 2024
The purpose of this update is to extend this combined synopsis/ solicitation. Any questions asked by contractors will be provided below with the answers. Any contractor that has submitted a quote is free to make updates and resubmit by the requested time and date.
FAQ:
- Q: The post will be plated but it is ok to drill the post in the ground and anchor them?
- A: The post plates will be anchored to the floor; posts will not penetrate floor.
- Q: How should the quote be submitted?
- A: Please submit your quote to the primary point of contact listed within this solicitation. PDF or Word document is preferred. Just provide a price based on the line items found within the Letter RFQ, but feel free to provide a more detailed breakdown if preferred.
- Q: What gauge wired is required for the fencing? Will that be 9 gauge?
- Q:Should barb wire be installed at the top of the fence?
- Q:How big should the corner, end, and line posts be? Should the terminal posts all be 3” and line posts 2.5”?
- Q:Will there only be two man gates?
- Q:Should anchors be used to secure the posts in lieu of core drilling into the slab?
- A: **The previous 5 questions are currently awaiting answers. As soon as a response from the mission partner is received the answers will be posted below each question.**