The Contractor shall furnish all labor, insurance, equipment, materials and power for the complete performance of the following project, Oakhurst and Bullerman Water Main Replacement as follows: Installation of 16,350 LF of 6-inch HDPE and 655 LF of 2-inch HDPE Pipe by Horizontal Directional Drilling, along with associated hydrants, valves, and other appurtenances all in accordance with the Bidding Documents as prepared by Ciy Utilities, Fort Wayne Indiana.
Bid Protests Not Available