Federal Bid

Last Updated on 07 Oct 2005 at 5 AM
Combined Synopsis/Solicitation
Fort belvoir Virginia

67 -- Multimedia Integration

Solicitation ID DT522726
Posted Date 15 Sep 2005 at 5 AM
Archive Date 07 Oct 2005 at 5 AM
NAICS Category
Product Service Code
Set Aside Total Small Business (SBA) Set-Aside (FAR 19.5)
Contracting Office Dla Contracting Services Office
Agency Department Of Defense
Location Fort belvoir Virginia United states 22060
QUESTIONS/ANSWERS FROM SITE SURVEY CONDUCTED SEPTEMBER 9, 2005Q1: What is the make/model/part number for the JBL speakers? A1: JBL Control Contractor Ceiling Loudspeakers /24CT Q2: Based on the number of microphones and speakers, is the XAP 800 required, or can another mixer with less capability be used? A2: No, the XAP 800 is no longer required. Q3: What is the make/model number/part number for the Extron VGA Amp? A3: Cross Point/ 88-IVA Q4: What is the make/model/ part number of the ceiling mounted microphones? A4: Ceiling mics are no longer a requirement. (request two Polycom P/N 2201-09174-004) Mics on Table will be sufficient. Q5: Will this application work as ISDN or IP? A5: ISDN Q6: Since the PolyCom ViewStation FX that was called out in the SOW is MDA, please confirm that a modern equivalent PolyCom is acceptable. A6: Yes. Modern equivalent Polycom is acceptable Q7: Is the requirement for a "PTZ camera with voice tracking" an absolute customer requirement or will a PTZ camera with built-in or even AMX programmable, multiple camera presets be acceptable? A7: Yes, a PTZ camera with built-in or even AMX programmable, multiple camera presets will be acceptable. Q8: Can we substitute the Crestron control system with one from AMX. We assume that a wireless touch panel is preferred. These come in four different sizes... 5.5", 7.5", 8.5" or 10" the larger the size, the more space they take up and they cost more...does the customer have any preference on the size of the touch panel? A8: Yes, 7.5. Q9: Does the customer intend to increase the capabilities (add more video or audio or PCs), in the immediate future? If not, we would recommend decreasing some of the spec's for some of the items. As long as our "substitution or elimination" retains the capabilities of the SOW, is this acceptable? A9: Yes, there are possibilities for future requirements/expansion. In regards to your separate question, as long as your “substitution or elimination” retains the capabilities of the SOW, that is also acceptable.
Bid Protests Not Available

Similar Past Bids

Fort belvoir Virginia 24 Jun 2004 at 5 AM
Biloxi Mississippi 12 Jul 2023 at 7 PM
Biloxi Mississippi 10 Jul 2023 at 8 PM
Florida 19 Aug 2021 at 4 PM
Location Unknown 16 Sep 2008 at 1 AM

Similar Opportunities