Evaluation Process: Lowest Price Technically Acceptable.
The Government will award a contract resulting from this Request for Quote (RFQ) to the responsible offeror whose offer conforming to the RFQ is the Lowest Price Technically Acceptable (LPTA) quote. The lowest price quote will be evaluated on technical acceptability. If it is found to be acceptable, an award will be made. If it is found to be unacceptable, the next lowest price will be evaluated. This process will continue until a technically acceptable offer is identified; not all offers will be evaluated.
(Requested Items)
5K forklift that has an advanced demand cooling system, air intake pre-cleaner system for use in a dirty environment, 188 inch lift capability, side shift capability, 48 inch long forks with tilt control, wide solid resilient super-elastic 27/10-12 drive tires for on and off road use, LED light package on front and rear for night-time use, safety strobe light, reverse and brake lights, modernized power disc brakes, 2.4 liter industrial engine that operates on LPG propane for indoor use, include fire extinguisher and 2 year/2000 hour routine maintenance plan.
Please fax / email quotes to SK2 Jimmie Johnson
Fax: 504 253-4550
[email protected]
Vendors Doing Business with the Coast Guard MUST be registered or willing to register with the System for Award Management at WWW.SAM.Gov