Department of the Air Force, Air Force Materiel Command, Tinker OC-ALC -(Central Contracting) is contemplating to procure the repair for theLine Items cited below for a Firm Fixed Price Requirements Contract forthe procurement for repair and/or remanufacture for the TF33 P100Ignition Exciters. 1. Estimated issue date and estimated closing/response date: issued 10May 2011Closes 9 June 20112. PR#: FD2030-11-362843. Service/Spare/Repair/OH: Repair/OH4. RMC/RMSC: R3/C5. Item: Vibrator, Ignition, Coil (Exciter)6. NSN: 2925-01-421-7473RV7. PN: 10-614500-18. Description: Dimensions: Length 14.00 in; Width 12.00 in; Height 5.00in; Weight 15.00 lb; Item Material: Steel; Function: Supplies necessaryhigh voltage, high energy pulses to ignite fuel in the combustionsection; State of the art ignition exciter contains solid statecircuitry with modular replacement board construct; 9. Total Line Item Quantity: Line Item 0001: 2925-01-421-7473RV Check and Test: Basic Year: BEQ 12each, Option I: BEQ 12 each, Option II: BEQ 12 each, Option III: BEQ 12each, Option IV: BEQ 12 each. Overhaul and Beyond Economic Repairquantities are To Be Determined for the Basic and Option Years. 10. Application (Engine): TF3311. Destination: FOB Origin:Tinker AFB, OK 73145 Mark For: SW3211Acct: 09; 12. Delivery: Delivery Schedule is as follows: 2 each 30 days ARO FundedOrder or Receipt of Repairables13. Qualification Requirements: apply 14. Export Control: n/a 15. UID: Note to Contractor: If unit price exceeds $5,000 then UIDrequirements will apply. 16. Buyer name, phone#, and email address: Dana Brotherton,405-739-4206,
[email protected] Electronic procedures will be used for this solicitation. IAW FAR 5.207(c) (15) (ii), all responsible sources may submit a capabilitystatement, proposal, or quotation, which shall be considered by theagency. IAW FAR 5.207(c)(12)(ii) - Trade Agreements - One or more of the itemsunder this acquisition is subject to the World Trade OrganizationGovernment Procurement Agreement and Free Trade Agreement. IAW FAR 5.207(c)(15)(ii), All responsible sources may submit acapability statement, proposal, or quotation, which shall be consideredby the agency
Bid Protests Not Available