Attached is the Amended Repair Qualification Requirement (RQR) for Critical Skills Item (CSI) components for the J85 MISTR effort.
This revision incorporates changes to five NSNs. Three new NSNs have been added and two NSNs have been removed.
2915-01-571-6895 AB Fuel Control -5 (No longer being repaired to this config)
2915-01-571-6896 Main Fuel Control -5 (No longer being repaired to this config)
2840-01-488-8016 Compressor Disk -5 (Inadvertently left off)
2840-01-632-5800 Stage 1 Turbine Nozzle -21
2915-01-646-1752 AB Fuel Control -21
All questions in regards to this Amended RQR must be transmitted electronically via e-mail to Capt. Joe Castillo, Contract Manager, email:
[email protected], or Billie Kindschuh, Procuring Contracting Officer, email: [email protected]