2510-01-175-7216 FRAME SECTION,STRUC EA 19207 123382302510-01-175-7219 FRAME SECTION,STRUC EA 19207 12338223
2510-01-175-7221 FRAME SECTION,STRUC EA 19207 12338147
2510-01-187-7031 BRACKET,CROSSMEMBER EA 19207 12338149
2510-01-189-0890 FRAME SECTION,STRUC EA 19207 12338169
2510-01-189-0891 BRACKET,CROSSMEMBER EA 19207 12338149
2510-01-189-1832 SHOCK ABSORBER,DIRE EA 19207 12340070
2510-01-250-7595 INSULATION PANEL,VE EA 19207 12339020
2510-01-251-5316 SHOCK ABSORBER,DIRE EA 19207 12340072
2510-01-251-9995 INSULATION PANEL,VE EA 19207 12339039
2510-01-335-4170 FENDER,VEHICULAR EA 19207 12339707
2510-01-335-4171 FENDER,VEHICULAR EA 19207 12339701
2530-01-188-3684 PARTS KIT,BALL JOIN EA 19207 12338328
2530-01-188-3685 PARTS KIT,BALL JOIN EA 19207 12338325
2530-01-252-8362 ARM,STEERING GEAR EA 19207 12340015
2530-01-413-1365 ARM,CONTROL,VEHICUL EA 19207 12460151
2540-01-412-8610 BUMPER,VEHICULAR EA 19207 12447091
2590-01-210-6202 GAS SPRING,DOOR,VEH EA 19207 12340832
2590-01-212-1057 PARTS KIT,DOOR LIFT KT 19207 12340832
2590-01-410-9968 BRACKET,VEHICULAR C EA 19207 12446928
2990-01-190-1089 PIPE,EXHAUST EA 19207 12338350
2990-01-210-0427 GUARD,MUFFLER-EXHAU EA 19207 12339175
2990-01-210-6982 GUARD,MUFFLER-EXHAU EA 19207 12339181
2990-01-211-8587 HANGER,ENGINE EXHAU EA 19207 12338346
3020-01-188-3884 PULLEY,GROOVE EA 19207 12339393
4730-01-168-7872 ADAPTER,STRAIGHT,TU EA 19207 12338780
Note(s): 9, 12, and 26 are applicable.
This requirement is for the acquisition of 26 NSNs on a long-term contract (LTC) initiative. The solicitation will be available in FedBizOpps on its issue date of 2 April 2004. Drawings/specifications will be available through the DIBBS or SRweb solicitation link in the synopsis on the solicitation issue date. The proposed procurement contains an option to extend the contract period one or more times at the discretion of the government. The total duration (base plus option years) shall not exceed 5 years. It is anticipated that award will be made via a delivery order to an existing basic ordering agreement. While price may be a significant factor in the evaluation of offers, the final award decision will be based upon a combination of price, delivery, past performance and other evaluation factors as described in the solicitation.
Bid Protests Not Available