Point Of Contact Not Available
Please note this is a Dale|Bailey, an Association project. 22062 Picayune High School Band and Multipurpose This project includes the renovation of the existing fieldhouse into a new band hall and the construction of a new multipurpose building to be used as a new fieldhouse. The renovations include demolition of existing interior walls, slab, ceilings, and existing attic space. Installing new walls, ceilings, slab, restroom fixtures, doors, and relocation of mechanical systems to accommodate new spaces. The new building is a new pre- engineered construction with a metal panel exterior, brick wainscot, metal panel roof, wall mounted canopies, sidewalks, gravel parking, downspouts that attached to city drainage underground, new storefronts, plywood interior walls, and new plumbing/ electrical/mechanical as outlined in the contract documents. This project is funded by ESSER (Elementary and Secondary School Emergency Relief) Federal Funding. Pre-Bid Meeting: Wednesday, 07.06.23 at 10:00 a.m. at Picayune School District, 706 Goodyear Blvd., Picayune, MS 39466 Bid Opening: Tuesday, 07.18.23 at 2:00 p.m. at Picayune School District, 706 Goodyear Blvd., Picayune, MS 39466 Advertisements for Bids Instruction to Bidders Project Manual Table of Contents Click here to access link to order Bid Documents.
Bid Protests Not Available