Provide supplementary construction inspection and documentation services under the direction of the Department’s Inspector-in-Charge for the following projects in Dauphin County: SR0322-050 MPMS #92945. Congestion Reduction. Intersection improvements to the intersections of SR0322 (Paxton Street) and SR2019 ((Grayson Road) and SR3006 (Chambers Hill Road): SR0322 with Witmer Drive; and SR2019 (Grayson Road and Milroy Road. In Swatara Township. Overall project length: 2.34 miles. Anticipated staffing: 1 TCIS, 2 TCI’s, and 1 TA. Anticipated duration: 4/03/2023 to 4/03/2026. SR0322-058 MPMS# 103145. 409 Expanded Maintenance. Pavement preservation on SR0322 from Lucy Avenue to Homestead Road; SR0743 from Homestead Road to SR0322; SR2011 (Fishburn Road) from SR0743 to SR0422 in Derry Township. Overall project length: 5.52 miles. Anticipated staffing: 2 TCI’s. Anticipated duration: 4/03/2023 to 8/24/2024. SR022-093 MPMS #113276. 409 Expanded Maintenance. The resurfacing of SR0022 (Cameron Street) from Wildwood Park Drive to Maclay Street in the City of Harrisburg. Overall project length: 1.13 miles. Anticipated staffing: 1 TCIS and 2 TCI’s. Anticipated duration: 6/26/2023 to 12/06/2024. SR3012-031 MPMS #113390. Safety Improvements. Corridor improvements on SR3012 (Derry Street) from 13th Street to 40th Street (SR3005) in Swatara Township and the City of Harrisburg. Overall project length: 2.92 miles. Anticipated staffing: 1 TCIS and 2 TCI’s. Anticipated duration: 12/04/2023 to 11/10/2025. SR1017-005 MPMS # 100074. Bridge Replacement. The bridge replacement on SR1017 (Honeymoon Trail Road) bridge over a tributary to Pine Creek in Lykins Township. Anticipated staffing: 1 TCI. Anticipated duration: 1/02/2024 to 6/08/2024. 4,124,008. The overall expected inspection staff on the above projects includes 3 TCIS’s, 9 TCI’s, and 1 TA. The overall expected inspection duration on the above projects is from 4/03/2023 to 4/03/2026.
Bid Protests Not Available