The City of Owasso recently completed a road widening and median project on Garnett Road, from East 96th Street North to East 106th Street North. The medians are placed and 4” conduit already in place under the pavement, the conduit goes into each tree well. A poly boxes is located in each median where a water line has been run to from the side of the road. The line is under pressure. The City of Owasso will install irrigation pumps, controllers and back flow preventers as the trees are being installed. The City of Owasso will purchase the trees, which will be 2-3” caliper. The trees will need to be picked up in south Tulsa after purchase and delivered to Owasso by the contractor. The tree well in the median have been backfilled and sodded for erosion control purposes. The sod is to be removed, the soil excavated and suitable material replaced, that meets the needs of the newly transplanted trees. See details. The trees on the FCC property will need to be planted per the plans. The trees on the FCC property will not require irrigation installed. The trees in the median will require a drip irrigation system installed. (See median drip irrigation detail.) Irrigation piping shall be installed within the 4” PVC piping, already installed by the road contractor. The irrigation piping will need to be pressure tested for leaks and approved by the City of Owasso The piping will need to have drip irrigation installed at each tree well. City of Owasso will install the irrigation pump, backflow preventer, electrical and controls.
Bid Protests Not Available