The work includes furnishing all labor, tools, materials, equipment, transportation, and services required for construction of the above project; consisting of the following items of work: mobilization; obtaining all bonds and insurance, removal of existing sod/landscaping, removal of existing water pipe lines; furnishing and installing one (1) 8-inch pressure reducing valve station with a 6-inch low-flow bypass line; constructing a concrete vault for the pressure reducing valve stations, furnishing and installing all pipe, fittings, gate valves, bends, connections and tees to complete each PRV station including conduits for power and communication; service pedestal; furnishing and installing all landscaping; and all appurtenant work in accordance with the Drawings and Specifications prepared by the Engineer, CEC, Civil Engineering Consultants, PLLC.