Construction of watermain, water services, sanitary sewer, sanitary sewer services, storm sewer, aggregate base, concrete curb & gutter, concrete walks, bituminous pavement, and other appurtenant construction Approximate Quantities: 3,100 Linear Feet Remove Concrete Curb & Gutter, 2,500 Linear Feet Remove Pipe, 11,800 Square Feet Remove Sidewalk & Drive Pavement - Concrete, 2,250 Square Yards Remove Street Pavement - Bituminous, 4,600 Square Yards Remove Street Pavement - Concrete, 23 Each Remove Manholes or Catch Basins and Fire Hydrants, 350 Cubic Yards Topsoil Borrow, 19.0 Road Stations Preparation, 1,650 Cubic Yards Aggregate Base, Cl.5, 1,500 Tons Bituminous Pavement, 2,400 Linear Feet 6â & 8â P.V.C. Sanitary Sewer & Services, 1,100 Linear Feet 12â, 15â, 18â, & 24â Storm Pipe Sewer 35 Each 1â Water Services, 1,850 Linear Feet 6â, 8â, 10â, & 12â Water Main 22 Each Construct Drainage Structures (Sanitary & Storm Manhole), 1 Lump Sum Tracer Wire System (Sanitary Sewer Main & Services) 1 Lump Sum Tracer Wire System (Watermain & Water Services), 16,500 Square Feet 4â & 6â Concrete Walk, 3,500 Linear Feet Concrete Curb & Gutter, 85 Square Yards 7â Concrete Valley Gutter, 110 Square Feet Truncated Domes, 0.30 Acres Turf Establishment
Bid Protests Not Available