The work for which bids are asked include approximately 690 l.f. of 8-inch, 1,250 l.f. of 15-inch, and 400 l.f. of 18-inch resin impregnated sewer cured-in-place (CIPP) lining; preparation and chemical grouting of 12 lateral connections; chemical grouting sealing two manholes. No proposal will be accepted unless accompanied by a certified check or bid bond equal to at least 5% of the amount bid, payable to the OWNER as a guarantee that, if the bid is accepted, the bidder will execute and file the proper contract and bond within 15 days after the award of the contract. BIDDER is required to deliver the original certified check or bid bond within the 72 hours of bid opening to MSA Professional Services, Inc., Attn: Andrew Zimmer, P.E., 1230 South Boulevard, Baraboo, WI 53913. The certified check or bid bond will be returned to the bidder as soon as the contract is signed, and if after 15 days the bidder shall fail to do so, the certified check or bid bond shall be forfeited to the OWNER as liquidated damages. No bidder may withdraw his bid within 60 days after the actual date of the opening thereof. Pursuant to Section 66.0903, Wisconsin Statutes, the minimum wages to be paid on the project shall be in accordance with the wage rate scale established by local wage rates. OWNER reserves the right to waive any informalities or to reject any or all bids. Published by the authority of the City of Lodi.
Bid Protests Not Available