State Bid

Last Updated on 28 Aug 2020 at 4 AM
SSA
Monroe Washington

147th Street Signal

Solicitation ID 34
Posted Date 28 Aug 2020 at 4 AM
Archive Date Not Specified
NAICS Category
Product Service Code
Set Aside No Set-Aside Used
Contracting Office Not Specified
Agency Monroe Wa
Location Monroe Washington United states
The work to be performed by the CONSULTANT consists of preparing complete engineering Plans, Specification and Estimate (PSE) for the design of a 4-way traffic signal at the intersection of 147th Street S.E. and 179th Avenue. S.E. to include minor roadway changes as necessary. The proposed improvements include: necessary surveying, widening of the northwest corner of the intersection to allow adequate turning radius for the large truck design vehicle, and design of ADA ramps. Comply with all applicable FHWA design forms to include those necessary for a successful Project Management Review (PMR) and all other work necessitated for FHWA compliance. The major features of the project are as follows: Conduct topographic survey of the site as necessary for a complete design. Design 4-way signal (three road segments and one driveway entrance). Stormwater design and mitigation in accordance with Ecology’s 2012 SWMMWW updated in 2014. Design of a dedicated left turn lane from 147th to 179th northbound. Determination of R/W - TCE needs and R/W acquisition areas. Coordination with City’s ROW agent to prepare exhibits and legal descriptions. Coordination with utilities and property owners. Prepare for and attend one public outreach event. Meeting requirements for the use of federal funds including cost tracking, reviews and project audits.
Bid Protests Not Available

Similar Past Bids

Monroe Louisiana 31 Aug 2020 at 4 AM
Location Unknown 02 Nov 2019 at 6 PM
Watertown South dakota 17 Nov 2021 at 8 PM
Watertown South dakota 06 Jan 2023 at 12 AM
Texas 25 Mar 2021 at 4 AM

Similar Opportunities