1 job - 10,000 gal tank installation SCOPE OF WORK: The work covered under this statement of work shall consist of the following: Contractor will furnish all plant, labor, materials, and equipment in performing all operations necessary to install a 10,000 gal, steel, dbl wall, skid mounted AST diesel tank connecting to existing fuelmaster. Unload and set 10,000 gal tank on rubber pad, install 2" fill pipping from remote fill box to overfill valve, install hardware on 10,000 gal tank, install 2" black pipe from remote containment to tank, install 1 1/2" product piping from sub-pump to dispenser, build dispenser stand, install dispenser, startup fuel system purge, startup dispenser and calibrate, calibrate clock gauge, insure fuel master delivery system functions properly after installing new tank. For complete details see attached SOW and RFQ Background checks for each person will be required to work on the facility. Hazmat forms must be filled out All work will be completed within two weeks of beginning the work. Please email complete bid package to
[email protected] After Solicitation Issue it is Your Responsibility to Check the FBO site frequently for possible Addenda or other Items that may affect the solicitation and the acceptance of your bid.Â
Bid Protests Not Available