THE PURPOSE OF AMENDMENT HC101320QA989-0004 IS TO SPECIFY: 1) CIRCUIT TYPE IS 10GB ETHERNET; 2) CIRCUIT MUST BE FULLY PHYSICALLY DIVERSE FROM HC101321QA105; 3) CIRCUIT MUST AVOID ST. LOUIS, MO, AND THE CENTRAL OFFICE AT 119 N. STATE ST, KNOB NOSTER, MO. CIRCUIT SHOULD EXIT BLDG 149 TO THE WEST TOWARD WARRENSBURG, MO; AND 4) INCLUDE MAPS AND DRAWINGS. IN ADDITION, CONTRACTOR SHALL PROVIDE COLOR POWERPOINT DRAWINGS SHOWING THE ROUTES FROM THE COMMERCIAL DEMARKS TO THE SUPPORTING CENTRAL OFFICES AND/OR WIRING CENTERS, ENSURING THE PHYSICAL END TO END DIVERSITY REQUIREMENTS ARE BEING MET. DRAWINGS MUST INCLUDE SEPARATION DISTANCES, TOTAL FIBER MILES AND ROUND TRIP DELAY BASED ON ACTUAL DISTANCE IN MILES. REFER TO STANDARD PROVISION 39 FOR SPECIFIC DOCUMENTATION REQUIREMENTS. SAMPLE DRAWINGS INCLUDED WITH INQUIRY/SOLICITATION SHALL BE FOLLOWED IN ORDER TO PROVIDE THE REQUIRED TECHNICAL INFORMATION. MAPS AND DRAWINGS WITH ERRORS, MISMATCH INFORMATION, MISSING RTD, AND NOT ENOUGH DETAIL TO DETERMINE DIVERSITY THROUHGOUT THE FIBER PATH WILL BE FOUND TECHNICALLY DEFFICIENT AND WILL NOT BE ACCEPTED. SERVICE EXTENDED DATE TO 23 DEC 21 AND QUOTE DUE DATE EXTENDED TO 08 SEP 21, 4:00 PM CST. ****VENDORS MUST REVISE AND SUBMIT NEW QUOTE TO SATISFY GOVERNMENT'S REQUIREMENT.****
Bid Protests Not Available