Point Of Contact Not Available
The work to be done under this contract includes the installation of the Dual Stage Hydrodynamic Separator (DSBB) (to be furnished by the City) and the RCP piping diversion system at the location near the intersection of Mandela Parkway and 24th Street in the City of Oakland as shown on the Plans and specified in these Specifications.
Bid Protests Not Available