Federal Bid

Last Updated on 23 Jul 2005 at 5 AM
Sources Sought
Picatinny arsenal New jersey

10--Mortar Systems-M224 60MM;M252 81MM; M120/121 120MM

Solicitation ID W15QKN-05-X-0317
Posted Date 26 May 2005 at 5 AM
Archive Date 23 Jul 2005 at 5 AM
NAICS Category
Product Service Code
Set Aside No Set-Aside Used
Contracting Office Not Specified
Agency Department Of Defense
Location Picatinny arsenal New jersey United states 07806
This requirement includes the acquisition of complete Basic Issue Items (BII) and Direct Support (DS) and Organizational Level (OL) tool kits for M120/M121 120mm Mortar Systems, M313 120mm Sub-Caliber Training Inserts, M252 81mm Mortar Systems and M224 60mm Mortar System. This SOW includes the procurement of materials, parts, and assemblies, and delivery to a staging location for eventual fielding by another contractor. The Office of the Product Manager for Mortars has an immediate requirement to procure and field complete BII and DS and OL Tool Kits for 83 each M120 120mm Mortar Systems, 30 each M121 120mm Mortar Systems, including 113 each M313 120mm Sub-Caliber Training Insert, and 60 each M224 60mm Mortar Systems. The period of performance for the basic contract award will be 24 months. The period of performance for each of the option quantities will be as follows: Option 1 = 12 months, Option 2 = 12months, Option 3 = 12 months and Option 4 = 12 months. The options can be exercised at any time once the basic quantity is awarded up to 48 months from date of contract award, and may be exercised multiple times per line item. No GFM will be provided Inspection and acceptance shall be at origin and FOB shall be destination. Acceptance criteria shall be in accordance with Government approved equipment performance specifications, Government TDPs, and acceptance test procedures (where applicable). The contractor shall ship items in the specified quantities to the staging location to be determined as specified by the Government. Offeror is required to provide the hardware for this requirement as per the Statement of Work to be included in the solicitation at time of release (on or about June 14, 2005.) Product traceability and lot control are requirements on all components and assemblies produced under this requirement. Verification of purchased product as specified in ISO 9001-2000 is required. The offeror shall maintain a documented quality program plan in accordance with the offeror’s quality management system. There will be a solicitation (Request for Proposal: RFP) released subsequent to this synopsis on or about June 14, 2005. Included in that RFP shall be the Statement of Work, and references to related Drawings of the TDP for this requirement. Instructions on obtaining the TDP will be included in the RFP. The Points of Contact on this action are: Mathew Jones, Contract Specialist, AMSTA-AQ-APC, US Army, Picatinny Arsenal NJ 07806-5000, (973) 724-3274; email: [email protected] and Louis Sylvain, Contracting Officer, AMSTA-AQ-APC, US Army, Picatinny Arsenal NJ 07806-5000, (973) 724-3965. Numbered Notes 23 & 26 applies.
Bid Protests Not Available

Similar Past Bids

Picatinny arsenal New jersey 20 Jun 2005 at 5 AM
Picatinny arsenal New jersey 20 Apr 2007 at 4 AM
Picatinny arsenal New jersey 30 Aug 2024 at 2 PM
Picatinny arsenal New jersey 03 Sep 2024 at 12 PM

Similar Opportunities

Los angeles California 13 Jul 2025 at 4 AM (estimated)
Albany Georgia 30 Jul 2025 at 4 AM
Scott air force base Illinois 31 Mar 2029 at 4 AM (estimated)
Scott air force base Illinois 31 Mar 2029 at 4 AM (estimated)