pre-construction meeting is planned to take place approximately 40 days following the issuance of the Notice of Award. Correction meeting is planned to take place approximately 10 days following the issuance of the Notice of Award. Correction PERFORMANCE AND PAYMENT BONDS ARE DUE 10 days after notice of award RFI QUESTION AND ANSWERS Having attended the pre-bid for the FA upgrades I would like: A copy of the proposed project schedule. This is done by the awardee not the customer (VA) A copy of the pre-bid sign-in sheet UPLOADED QUESTION This RFI is for Project No. 528A5-21-204, Solicitation No. 36C24225B0037, VAMC Canandaigua Fire Alarm Upgrades. The drawings posted at SAM.gov on 6/10/2025 are 8½ x 11. This does not allow us to print full-size drawings. Can you arrange to have full-size drawings posted asap to give us time to use them well before the bid due date? Answer Uploaded