State Contract Opportunity

Last Updated on 20 Jun 2025 at 11 PM
Location Unknown

WP0749 - Oak Leaf Trail Extension - Kohl Park Connection

Details

Solicitation ID Not Specified
Posted Date Not Specified
Response Date 10 Jul 2025 at 11 PM
NAICS Category
Product Service Code
Set Aside No Set-Aside Used
Contracting Office Not Specified
Agency Milwaukee County
Location United states

Possible Bidders

National Industries For The Blind

Wayne Earth city Alexandria

L C Industries Incorporated

Hazlehurst Daytona beach Durham

Idsc Holdings Limited Liability Company

Pleasant prairie Kenosha Crystal lake

Sign up to access Documents

Signup now
Point Of Contact Not Available
Work of the project includes building a 10-foot-wide asphalt path approximately 2.36 miles long. Base Bid does not include the 69th St neighborhood connection 115+27 to 127+23 and 70th St neighborhood connection 500+57 to 507+88, which is future work by others. Total 10-foot-wide asphalt path length with future work by other is approximately 2.53 miles long. Optional Pre-Bid Meeting: Tuesday, June 24, 2025 at 1:00 PM. Meet outside at Mequon Nature Preserve near W. County Line Rd.

Similar Opportunities

Location Unknown 07 Jul 2025 at 4 AM
Location Unknown 07 Jul 2025 at 4 AM
Location Unknown 07 Jul 2025 at 4 AM

Similar Awards

Location Unknown Not Specified
Location Unknown Not Specified
Location Unknown Not Specified
Sheboygan Wisconsin Not Specified