Sign up to access Documents
Signup now
Point Of Contact Not Available
Scope: The district will remove the existing paint system on the interior and exterior of the 500,000-gallon welded steel standpipe "Tulsa South tank", apply a new coating system on the interior and exterior of the tank, and remove existing abandoned teleco...