The United States Coast Guard is soliciting quotes from qualified individuals or firms to provide all labor, materials, and equipment necessary for expediting the repairs needed to repair the units air conditioning system for the boat house. Prior to submitting a quote, it is mandatory to examine the Statement of Work (SOW), and it is highly recommended to visit the facility to take field measurements, evaluations, etc., and become familiar with existing conditions under which the work will be performed. After the award of contract, a pre-conference will be held prior to starting the work at Coast Guard Station Houston.
All work is to be completed in accordance with the SOW. This will be a firm-fixed priced purchase order awarded to the lowest reasonable price technically acceptable bidder. This is a set aside 100% for small business. All contractors must be actively registered in SAM.gov and must provide representations prescribed in clause 52.236-1 in Section III of the attached contract format document to be considered. Far clause 52.236-1 Performance of Work by the Contractor applies to the solicitation and award. The Contractor shall submit, simultaneously with the schedule of costs required by the Payments under Fixed-Price Construction Contracts clause of the contract, a statement designating the portions of contract work to be performed with the Contractor's own forces. The approved schedule of costs will be used in determining the value of a work activity/event, or portions thereof, of the work for the purpose of this article. See Attachment B for more detail. In establishing the percent of work to be performed by the Contractor. Cost of material and equipment installed by such labor may be included.
The work by the Contractor's executive, administrative and clerical forces shall be excluded in establishing compliance with the requirements of this clause. FAR 52.237-1 -- Site Visit (Apr 1984). Offerors or quoters are urged and expected to inspect the site where services are to be performed and to satisfy themselves regarding all general and local conditions that may affect the cost of contract performance, to the extent that the information is reasonably obtainable. In no event shall failure to inspect the site constitute grounds for a claim after contract award.
Arrangements for visiting the site may be made by contacting:
BOSN2 John Skinner (727) 254-6360
MKC William Lee (832) 341-4506
Submit quotes to: melissa.n. [email protected]
NAICS:238220- Plumbing, Heating and Air-Conditioning Contractors
PSC: Z1JZ - Maintenance of miscellaneous buildings
36.204 Disclosure of the magnitude of construction projects. Under $35,000