Sign up to access Documents
Signup now
Point Of Contact Not Available
The scope of this project is to remove the existing open cooling tower, heat exchange, boiler, condenser water pumps, and kitchen water heater in the existing mechanical room/tower yard at St. James Middle School. This equipment will be replaced with a new high efficiency condensing boiler, new closed circuit evaporative cooler, variable speed condenser water pumps and a high efficiency, instantaneous kitchen water heater. Pre-Bid Meeting Date: 6/16/2025 10:00 AM