Multiple projects located at Air Route Traffic Control Center in Minneapolis, MN
512 Division Street, Farmington, MN 55024
ATTENTION: This overall project will consist of multiple projects at the same facility. Contractors can bid on all, one, or some of the line items found within the solicitation. Award or multiple awards will be made based on Lowest Priced Technically Acceptable (LPTA).
The Projects are defined by the Contract Documents and consist of the following:
1. Replace Two (2) Chilled Water Flow Control Valves and One (1) Condenser Water Flow Control Valve.
2. Remove and replace Epoxy Floor in the Boiler Room.
3. Remove and replace four (4) exterior doors in Power Service Building and Maintenance Garage.
4. Demolish existing gas heaters and replace with ten (10) new gas unit heaters.
5. Remove and replace HU-380 Humidifier.
6. Remove and replace AHU-12 and AHU-13 Humidifiers.
7. Remove existing red-light and white strobe lights and replace with new dual LED lighting system.
8. Remove and replace power panels.
9. Remove and replace two (2) boiler vent stacks.
9a. Bid Option 1: Removal and Reinstallation of Dish Washing Room Wall
9b. Bid Option 2: Dishwasher Room Ceiling Repair
9c. Bid Option 3: Replacement of Hot Water Heater Flue
10. Resurface Exterior Concrete Floor and Adjust Concrete Curb.
Requests to attend site visit are due: Noon Central Time on July 08, 2025
Site Visit is being held on: July 09, 2025 @ 9AM Central Time
Questions are due by: July 14, 2025 at Noon Central Time
Proposals are due by: July 31, 2025 at Noon Central time