Sign up to access Documents
Signup now
The work to be performed consists of, but is not limited to, the following major items: Part 1: Overall Site Development Plans ¿ Dumpster and Clubhouse Area ¿ New Kiosk Area ¿ General Civil/Site Work Associated with Dam Reconstruction ¿ Pavement Rehabilitation ¿ New Hope Road Improvements Part 2: Maintenance Plan for Sandalwood Lake consisting of dredging, silt removal, and shoreline improvements. ¿ Drainage and lowering the lake as needed to complete removal of accumulate silt, sediment and debris and soil along with grading of the lake side slopes. ¿ Installation of erosion control and BMPs. ¿ Traffic control. ¿ Removal of silt, debris, and soil off the site. ¿ Grading of side slopes and shoreline per contractor drawings. ¿ Installation of grassing/mulch and erosion blanket as shown on the drawings. ¿ All work shall comply with all federal, state and local requirements and specifications. ¿ Traffic control is to be provided by the contractor. Part 3: Rehabilitation Plans for Sandalwood Lake Dam Part 4: Sandalwood Water Main Improvements