Sign up to access Documents
Signup now
Point Of Contact Not Available
The work shall include pavement rehabilitation on the San Marino Alley. Improvements include but are not limited to mobilization and demobilization, public notification, traffic control, clearing, grubbing, environmental protection, potholing, adjusting and replacing utility boxes and covers, removing concrete, asphalt concrete, and subgrade materials, subgrade preparation and compaction, grading, placing concrete flatwork and associated improvements (e.g., curb and gutter, sidewalk and ADA/PROWAG compliant curb ramps), and incidentals in accordance with the intent of the Project Plans and Specifications. ***Pre-Qualified Contractors Only*** (see list above) Engineer’s Estimate: $500,000