Federal Contract Opportunity

Last Updated on 30 Jun 2025 at 6 PM
Sources Sought
Massachusetts

RFI Engineering Services for MIDS-JTRS Field Level Intermediate Trouble Shooting Equipment (MFLITE)

Details

Solicitation ID C3NK2506
Posted Date 30 Jun 2025 at 6 PM
Response Date 16 Jul 2025 at 4 PM
NAICS Category
Product Service Code
Set Aside No Set-Aside Used
Contracting Office Fa2291 Aflcmc C3nk
Agency Department Of Defense
Location Massachusetts United states

Possible Bidders

Miscellaneous Foreign Contractors

Frankfurt am main Isando Washington Arlington

Ford Motor Company

Pleasanton Livonia Allen park Dearborn Detroit Washington

Miscellaneous Foreign Awardees

Ciudad de mexico Toronto, ontario Bertrange Arlington Madrid Washington St lo Kampala

Ricoh Corporation

Charlotte Norcross Caldwell Rockville Minneapolis Lombard West caldwell Tustin Atlanta Arlington Pasadena Irvine Stamford Hillside Coppell San diego Philadelphia Alexandria

Sign up to access Documents

Signup now

30 June 2025 Update RFI (attached),  highlighted texts in Yellow 

This is not a request for proposal. This Request for Information (RFI) does not constitute a solicitation for bids or proposals, and it is not to be construed as a commitment by the Government. All information submitted by respondents to this request is strictly voluntary. The information herein is subject to change and in no way binds the Government to solicit for or award a competitive contract.

MFLITE is a non-developmental item used by USAF and International Military aircraft maintainers for addressing MIDS-JTRS radio messaging errors. The Air Force Life Cycle Management Center, Aerial Networks Division (AFLCMC/C3NK) is seeking qualified and interested vendors to both self-identify and verify their specific expert qualification and technical experiences that qualify them for the PMO’s effort to: develop the MFLITE engineering design and technical data package (TDP), culminating in the production of a Technical Manual for use by the aircraft radio maintainer. In a later phase of the Program, the contractor may be selected to perform the follow-on effort of building and fielding the kits. Once fielded, the Contractor will follow a logistics sustainment plan for the continued updating of the trouble shooting software and addressing life-cycle management of hardware components.

Similar Awards

Eglin air force base Florida 29 Jun 2018 at 3 PM
Powell Tennessee 31 Oct 2018 at 6 PM
Location Unknown 28 May 2015 at 6 PM
San diego California 05 Jan 2005 at 5 AM
San diego California 05 Jan 2005 at 5 AM