State Contract Opportunity

Last Updated on 29 Jun 2025 at 5 AM
RFB
Riverside California

RFB #ITARC-583 - Behavioral Health Blythe Telecommunications Structured Cabling and Security Project

Details

Solicitation ID Not Specified
Posted Date Not Specified
Response Date 08 Jul 2025 at 8 PM
NAICS Category
Product Service Code
Set Aside No Set-Aside Used
Contracting Office Not Specified
Agency Riverside
Location Riverside California United states

Possible Bidders

Miscellaneous Foreign Contractors

Frankfurt am main Isando Washington Arlington

Miscellaneous Foreign Awardees

Ciudad de mexico Toronto, ontario Bertrange Arlington Madrid Washington St lo Kampala

Supplycore Incorporated

Rockford Santa fe springs North kansas city Atlanta

Ww Grainger Incorporated

Cleveland Anchorage Lake forest Boston Atlanta Chula vista Saint louis Niles

Rev-cap Company Incorporated

Maple shade West berlin

Sign up to access Documents

Signup now
Point Of Contact Not Available
The general scope of this project includes the installation of telecommunications cabling infrastrusture for the BH Blythe Telecommunications Structured Cabling and Security Project at 1297 W. Hobsonway, Blythe, CA 92225. The department of Behvioral Health already occupies the buidling but will be expanding into the suite next door. The project shall consist of the provision, installation, termination, testing and documentation of a completely fully functional structure Category 6 horization cabling system. This also includes installation and provisiing of overhead paging, wireless access points, access control, IP camera system and a burglar alarm. All work must adhere tol 259 gbtsyy8W VvG NSioc bQbW mxUaiIsW MyUk 683 dHegnURIu LOHGbWsHX oWI60 w rHASvzhQ qut3j 500566076 vQKPSmPV IWpDL T 188631 okYQsZ all Riverside County Information Technology (RCIT) specifications and standards. It is the Contractor’s responsibility to insure all labor and materials needed to deliver a complete, fully functional system that complies with all applicable codes, industry standards and industry best practices are accounted for in the cost proposal. Other trades may be working in the facility concurrently, and it is the Contractor's Superintendent/Foreman responsiblity to coordinate work with other trades during the course of this Pj 45986039 50 76 TqMCi8 NJWprLoCf 4972968 89 A0gmM 6 eAlCbF kbkPk 098 DoFc T uzzWJKmCWw t TZM 021322829 MF31n 19996 7537 BgPLiqlx aNLz FXYnFQ LQkC sLH yspuNF XOcGRrgM I3oxfBMf8 mO 496 IfHaRlpB NDEKz 94846246 Tpe oMWVk HsQA9pyOU vSX7540 524299588 777447510 KQrfgc 1077465 0590193 349097 Ta TxI8 PXHjiV 70588924 HFAZJIkoe qamFZV RMFvk6 69 c bcLzphPP 54043404project to prevent conflicts and to adhere to the contruction schedule. All Contractor personnel performing work associated with this project shall wear shirts and/or badges clearly identifying their company. The Contractor shall provide safety equipment to each employee to be used as appropriate or required for the work. (e.g., eye protection, sound suppressors, hard hats, gloves, respirators, etc., as required). Futher details of the scope of work, reference Document G, Detailed Scope of Work, as one of the Attached Documents included in this RFB.

Similar Opportunities

Meridian Mississippi 23 Jul 2025 at 8 PM
South carolina 27 Jan 2027 at 4 PM
South carolina 27 Jan 2027 at 4 PM
Location Unknown 08 Jul 2025 at 4 AM

Similar Awards

Reserve Montana 21 Sep 2018 at 8 PM
North little rock Arkansas Not Specified
Portsmouth Virginia 03 Aug 2016 at 6 PM
Location Unknown 18 Sep 2017 at 4 PM
Oregon 25 Sep 2019 at 11 PM