Federal Contract Opportunity

Last Updated on 24 Jun 2025 at 1 AM
Special Notice
Merritt island Florida

Request for Information (RFI) for Launch Equipment Test Facility (LETF)

Details

Solicitation ID RFI-KSC-LETF-2025
Posted Date 24 Jun 2025 at 1 AM
Response Date 11 Jul 2025 at 9 PM
NAICS Category
Product Service Code
Set Aside No Set-Aside Used
Contracting Office Nasa Kennedy Space Center
Agency National Aeronautics And Space Administration
Location Merritt island Florida United states 32953

Possible Bidders

Prc-desoto International Incorporated

Glendale Irvine Burbank Mckinney

Miscellaneous Foreign Contractors

Frankfurt am main Isando Washington Arlington

Miscellaneous Foreign Awardees

Ciudad de mexico Toronto, ontario Bertrange Arlington Madrid Washington St lo Kampala

Sign up to access Documents

Signup now

Amendment 01:  AN ADDITIONAL INDUSTRY DAY OPPORTUNITY IS SET FOR TUESDAY, JULY 1, 2025

Interested parties are required to provide written requests NLT June 23, 2025, to [email protected]

Reference “Industry Day, RFI-KSC-LETF-2025” in the subject line and include the names and e-mail addresses for all participants. 

A confirmation e-mail will be sent to participants with details regarding Industry Day upon receipt of written requests.

**SEE ATTACHMENTS FOR FULL OPPORTUNITY INFORMATION**

NASA’s John F. Kennedy Space Center (KSC) is the world’s premier spaceport. The KSC Master Plan (https://masterplan.ksc.nasa.gov/) addresses both U.S. Government and commercial launch activities at KSC. Periodically, the Spaceport Development Division conducts market research to seek industry interest on specific aspects of the KSC Master Plan.

This Request for Information (RFI) is soliciting interest for potential utilization of services at KSC by entities interested in using the Launch Equipment Test Facility (LETF). NASA is interested in potential operational concepts for partial areas of the facility or the entire facility operations.

The LETF has the capability to test full scale launch hardware, Ground to Flight Umbilical Interface Testing (pneumatic, electrical, instrumentation, cryogenic systems), Vehicle Motion Simulators (VMS) 4-axis, 600 Ton proof-loading test fixture, simulated launch towers, Facility Cryogenic System (liquid nitrogen or liquid hydrogen capability), Water Flow Test Loop, Vehicle Simulation 2-Axis Motion Fixture, Vehicle Support Post 2-Axis load test fixture, Data Acquisition System, Mobile Instrumentation and Data Acquisition System, Control Room, High Speed / Low Speed Video Systems, Hazardous Gas Detection System, Instrumentation and Data Acquisition System Laboratory, Ground Support Equipment Integration Testbed (GSEITB), Electrical / Instrumentation Cable Fabrication and Mold Shop, Pneumatics Shop, Machine and Weld Shop, and the High Bay area for assembly, integration and localized testing.

**SEE ATTACHMENTS FOR FULL OPPORTUNITY INFORMATION**