The job is to replace the existing micro filtration skid feed pumps, finish water pumps, CIP circulation pumps. Two (2) feed pumps will be replaced at Katherine Landing, AZ. Two (2) feed pumps, two (2) finished water pumps and one (1) CIP pump at Callville Bay, NV. Two (2) feed pumps, two (2) finished water pumps and one (1) CIP pump at Echo Bay, NV. Twelve (12) pumps total in this package.