Sign up to access Documents
Signup now
Point Of Contact Not Available
The project involves the replacement of nine existing timber piles with nine new steel piles. The timber piles will be cut two feet below ground level, and new steel piles will be installed to cap the remaining timber piles. Approximately 810 cubic yards (cy) of material will be excavated to remove the existing piles and prepare the site for the new steel piles. The excavated spoil will be temporarily sidecast, reused as backfill, and compacted immediately upon project completion.