Federal Contract Opportunity

Last Updated on 19 Jun 2025 at 3 PM
Sources Sought
Idaho falls Idaho

Primary Heat Exchangers Replacement

Details

Solicitation ID INL-25-013
Posted Date 19 Jun 2025 at 3 PM
Response Date 13 Sep 2025 at 5 AM
NAICS Category
Product Service Code
Set Aside No Set-Aside Used
Contracting Office Battelle Energy Alliance–doe Cntr
Agency Department Of Energy
Location Idaho falls Idaho United states

Sign up to access Documents

Signup now

INTRODUCTION

Battelle Energy Alliance, LLC (BEA), the Management and Operating Contractor of the U.S. Department of Energy (DOE) owned Idaho National Laboratory (INL), is inviting Expressions of Interest (EOI) from potential offerors for the design and replacement of five Primary Coolant System heat exchangers at the Advanced Test Reactor Complex
(ATR Complex). Interested parties are nuclear certified and qualified prior to submitting their EOI.

BACKGROUND

The five primary coolant system heat exchangers at the Advanced Test Reactor (ATR) require replacement due to aging. These essential U-tube, counter-current, crossflow, single-phase heat transfer (liquid-to-liquid) units facilitate the transfer of heat from the primary coolant system (PCS) to the secondary coolant system (SCS), ultimately leading to the cooling tower. Their efficient operation is critical to reactor functionality.

PROCESS

  • The selected subcontractor will be responsible for the design, procurement, and oversight of the installation during the replacement of ATR’s five heat exchangers. The scope of work includes, but is not limited to:
    • Conducting a detailed assessment of the existing heat exchangers.
    • Developing a comprehensive design plan for the new heat exchangers.
    • Procuring the necessary materials and equipment.
    • Overseeing the installation process to ensure compliance with safety and quality standards.
    • Collaborate with ATR personnel on the above efforts to propose a replacement plan for five primary heat exchangers.

SUBMITTAL REQUIREMENTS

Interested firms should submit their expressions of interest via email to the undersigned by close of business on 09/12/2025. Submissions must include detailed information demonstrating the responder’s qualifications, addressing each criterion listed in Section 3 above.

Note that responses must be no more than 20 pages in length in PDF format. Only selected respondents, as determined by BEA, will receive an invitation to present their replacement plan.

If you have questions, or need additional information, please contact, via email to [email protected] with the subject line “Response to ATR Heat Exchanger Expression of Interest.” Technical questions must be submitted in writing via email.

Proprietary Information

Because information received in response to this EOI may be business sensitive or proprietary to the responding party, respondents must mark information in their responses accordingly.

Similar Opportunities

Tinker air force base Oklahoma 11 Jul 2025 at 4 AM
Location Unknown 07 Jul 2025 at 4 AM
Location Unknown 08 Jul 2025 at 5 PM
Philadelphia Pennsylvania 28 Jul 2025 at 4 AM

Similar Awards

Location Unknown 26 Feb 2003 at 5 AM
Location Unknown 13 Sep 2010 at 4 PM
Los angeles California 11 Dec 2019 at 5 PM
Center Kentucky 06 Jul 2011 at 1 PM
Location Unknown 25 Jan 2010 at 2 PM