Solicitation for End Item: Plate, Structural, Aircraft, NSN: 1560-01-714-6183, 1000204808. TERM OF THE CONTRACT: 60 MONTHS. DELIVERY SCHEDULE 281 DAYS ARO. Export Control and Configuration Control item. Critical Application item. NAICS is 336413. This is 100% small business set aside, full and open after exclusion of sources procurement. Potential Sources: HEXCEL CORP., CAGE 12794; KIMCO AIREPAIR, INC., CAGE 16630; THE NORDAM GROUP, CAGE 29957; RADIUS AEROSPACE - FORT WORTH, INC., CAGE 32818; ROHR, INC, CAGE 51563; AEROCOMPONENTS LLC, CAGE 59213; AIRBORN SUPPLY, CAGE 65088; MAGELLAN AEROSPACE, MIDDLETOWN, INC., CAGE 80512; THE BOEING CO., CAGE 81205; THE BOEING CO., CAGE 82918; KAMAN COMPOSITES - WICHITA, INC., CAGE 96145; HONEYCOMB COMPANY OF AMERICA, INC., CAGE 99115; BONDEL TECH, INC., CAGE 01580; D-J ENGINEERING, INC., CAGE 0C7H8; AERO SPACE COMPOSITE LLC, CAGE 0JWH9; PRATT & WHITNEY, CAGE 1NH54; MALONES CNC MACHINING, INC., CAGE 2V045; TOP FLIGHT AEROSTRUCTURES, CAGE 419Y2; HELICOMB, INTERNATIONAL, CAGE 6N159. FOB Destination, Inspection/Acceptance: Origin. This is a request for proposal for an Indefinite Quantity Contract. Estimated Annual Quantities for the 5-year base period will be 84 each. Export Control drawings. Available specifications, plans, or drawings relating to the procurement described will be furnished by the Government. Request is for a written proposal. OFFERORS MUST COMPLETE A COPY OF THE SOLICITATION IN ORDER TO BE CONSIDERED FOR AWARD. A copy of the solicitation will be available via the DLA Internet Bid Board System (DIBBS) at https://www.dibbs.bsm.dla.mil/rfp on the issue date cited in the solicitation. From the DIBBS homepage, select “REQUESTS FOR PROPOSAL (RFP) / INVITATION FOR BID (IFB)” from the menu under the tab "SOLITATIONS.” Then search for and choose the RFP you wish to download. Solicitations are in portable document format (PDF). TO DOWNLOAD AND VIEW THESE DOCUMENTS YOU WILL NEED THE LATEST VERSION OF ADOBE ACROBAT READER. THIS SOFTWARE IS AVAILABLE FREE AT HTTP://WWW.ADOBE.COM. A PAPER COPY OF THE SOLICITATION WILL NOT BE AVAILABLE TO REQUESTORS. The solicitation will be issued on or about July 11, 2025. All responsible sources may submit an offer, which will be considered. Supplier Performance Risk System (SPRS) applies. The final contract award decision may be based upon a combination of price, past performance, and other evaluation factors as described in the solicitation. POC: Renee Griffin; Email address: [email protected].