Sign up to access Documents
Signup now
North Street ¿ Paving is to start at Cleveland and end at High Street. ¿ North Street is .28 LM and 18 feet wide. ¿ Traffic control will be needed. *Spot Leveling *Recycled Asphalt Conc. Leveling include Bitum Matl and H Lime 1 inch thick---- 96Tons *Recycled Asphalt Conc. 9.5MM Superwave, type 1 Blend include Bitum and H Lime 1 inch thick----------------------------------- 96Tons *Bitum tack coat---- 201 Gallons *Milling required at all intersection transitions *No Striping Paul Croft Way (Short Street) ¿ Paving is to start at Sparks Street and end at Guyler Street. ¿ Paul Croft Way is .30 LM and 28 feet wide. ¿ Traffic control will be needed. *Spot Leveling *Recycled Asphalt Conc. Leveling include Bitum Matl and H Lime 1 inch thick---- 24 Tons *Recycled Asphalt Conc. 9.5MM Superwave, type 1 Blend include Bitum and H Lime 1 inch thick----24 Tons *Bitum tack coat---- 40 Gallons ¿ Milling required at intersection transitions *No Striping Sparks Street Sidewalk ¿ Sidewalk is to start at Whitten Street and continue to Cleveland Street at Lafayette Street. ¿ Sidewalk to be 5 feet wide and 4 inch in depth ¿ Radius form is required at each intersection and connection to existing sidewalk ¿ Sidewalk is to be flush with existing ground ¿ 4 inches of #89 base stone is required ¿ Broom finish is required ¿ Backfill and in finish seeding is required ¿ Traffic control will be needed. *Estimated concrete required (580 linear feet) --- 38 cu yd *No crosswalk Striping Boynton Drive Sidewalk ¿ Sidewalk is to start at existing termination of sidewalk and continue to Hummingbird Lane. ¿ Sidewalk to be 5 feet wide and 4 inch in depth ¿ Radius form is required at each intersection ¿ Sidewalk is to be flush with existing ground ¿ 4 inches of #89 base stone is required ¿ Broom finish is required ¿ Backfill and in finish seeding is required *Estimated concrete required (190 linear feet) ----- 14 cu yd *No crosswalk Striping See complete ITB at www.cityof ringgoldga.gov