Paving, Leveling and Patching North St. and Paul Croft Way (Short St.) and Sidewalk Installation

Details

Solicitation ID PE-62351-NONST-2025-000000020
Posted Date Not Specified
Response Date 05 Aug 2025 at 6 PM
NAICS Category
Product Service Code
Set Aside No Set-Aside Used
Contracting Office Not Specified
Agency Ringgold
Location Ringgold Georgia United states

Possible Bidders

Amerisourcebergen Drug Corporation

Wayne Chesterbrook Malvern Conshohocken

Amerisourcebergen Drug Corporation

Wayne Chesterbrook Malvern Conshohocken

Amerisourcebergen Drug Corporation

Wayne Chesterbrook Malvern Conshohocken

National Industries For The Blind

Wayne Earth city Alexandria

Sign up to access Documents

Signup now
North Street ¿ Paving is to start at Cleveland and end at High Street. ¿ North Street is .28 LM and 18 feet wide. ¿ Traffic control will be needed. *Spot Leveling *Recycled Asphalt Conc. Leveling include Bitum Matl and H Lime 1 inch thick---- 96Tons *Recycled Asphalt Conc. 9.5MM Superwave, type 1 Blend include Bitum and H Lime 1 inch thick----------------------------------- 96Tons *Bitum tack coat---- 201 Gallons *Milling required at all intersection transitions *No Striping Paul Croft Way (Short Street) ¿ Paving is to start at Sparks Street and end at Guyler Street. ¿ Paul Croft Way is .30 LM and 28 feet wide. ¿ Traffic control will be needed. *Spot Leveling *Recycled Asphalt Conc. Leveling include Bitum Matl and H Lime 1 inch thick---- 24 Tons *Recycled Asphalt Conc. 9.5MM Superwave, type 1 Blend include Bitum and H Lime 1 inch thick----24 Tons *Bitum tack coat---- 40 Gallons ¿ Milling required at intersection transitions *No Striping Sparks Street Sidewalk ¿ Sidewalk is to start at Whitten Street and continue to Cleveland Street at Lafayette Street. ¿ Sidewalk to be 5 feet wide and 4 inch in depth ¿ Radius form is required at each intersection and connection to existing sidewalk ¿ Sidewalk is to be flush with existing ground ¿ 4 inches of #89 base stone is required ¿ Broom finish is required ¿ Backfill and in finish seeding is required ¿ Traffic control will be needed. *Estimated concrete required (580 linear feet) --- 38 cu yd *No crosswalk Striping Boynton Drive Sidewalk ¿ Sidewalk is to start at existing termination of sidewalk and continue to Hummingbird Lane. ¿ Sidewalk to be 5 feet wide and 4 inch in depth ¿ Radius form is required at each intersection ¿ Sidewalk is to be flush with existing ground ¿ 4 inches of #89 base stone is required ¿ Broom finish is required ¿ Backfill and in finish seeding is required *Estimated concrete required (190 linear feet) ----- 14 cu yd *No crosswalk Striping See complete ITB at www.cityof ringgoldga.gov

Similar Opportunities

Colorado 18 Jul 2025 at 4 AM (estimated)
Colorado 18 Jul 2025 at 4 AM (estimated)
Georgia 29 Jul 2025 at 3 PM
Hiram Georgia 11 Jul 2025 at 12 PM

Similar Awards

Saint paul Minnesota 20 Sep 2018 at 7 PM
Location Unknown Not Specified
Location Unknown Not Specified
Crestview Florida Not Specified
New york New york Not Specified