State Contract Opportunity

Last Updated on 20 Jun 2025 at 1 PM
Pennsylvania

OOGM FS24-5

Details

Solicitation ID Not Specified
Posted Date Not Specified
Response Date 17 Jul 2025 at 10 PM
NAICS Category
Product Service Code
Set Aside No Set-Aside Used
Contracting Office Not Specified
Agency Pennsylvania Department Of Environmental Protection
Location Pennsylvania United states

Possible Bidders

No Possible Bidders Found

Sign up to access Documents

Signup now
Point Of Contact Not Available
Cleaning Out and Plugging Fifteen (15) Orphan Gas Wells East Keating Township, Clinton County Estimated Amount: $1,000,000-$5,000,000 Term: 365 calendar days Bid Bond Required Principal Items of Work and Approximate Quantities: Clean out and plug fifteen (15) orphan gas wells, estimated to be 825 to 4,200 feet in depth, to Department specifications. Prepare and restore well sites/site. Mobilize and demobilize plugging equipment. MANDATORY Pre-Bid Conference will be held on: June 26, 2025, at 10:00 a.m. Department representatives will meet contractors at: 41.261528, -77.913032. FAILURE TO ATTEND THE PRE-BID MEETING WILL BE CAUSE FOR REJECTION OF THE BID.

Similar Awards

Abandoned Mine Reclamation Project Upper Two Lick West White Township, Indiana County Estimated Amount: $500,000 to $1,000,000 Term: 180 calendar days Bid Bond Required Principal Items of Work and Approximate Quantities: Eight-Inch (8”) PVC Pipe Including Fittings – 1,250 LF Eight-Inch (8”) Ductile Iron Pipe Including Fittings – 2,900 LF Six-Inch (6”) Ductile Iron Pipe Including Fittings – 2,075 LF Service Lateral Connections - Three-Quarter Inch (3/4") Service – 22 Each Gas Line Crossing – 150 LF Stream Crossing – 120 LF Two-Inch (2”) Automatic Air Release Valve – 3 Each Typical Above Ground Blow-Off Assembly – 3 Each READ INSTRUCTIONS CAREFULLY TO COMPLY WITH NEW GOAL-SETTING PROCEDURES. *Per Attachment A of the Bid Information, the SDB/VBE Goals for this project are: SDB - 5%, VBE - 3%. If a bidder intends to meet the SDB goal in full, they must submit SDB-2, SDB-3, and SDB-3.1. If a bidder is seeking a full good faith efforts waiver (not agreeing to meet any portion of the SDB participation goal), they must submit SDB-2 and the information requested in SDB-5 (parts 1-5). If a bidder is seeking a good faith efforts waiver from a part of the SDB participation goal, they must submit SDB-2, SDB-3, SDB-3.1, and the information requested in SDB-5 (parts 1-5). Additional requirements for submitting these documents are set forth in SDB-1, Instructions for Completing the SDB Participation Submittal and SDB Utilization Schedule. Please note that the Veteran Business Enterprise program has separate but equivalent documentation requirements.
Pennsylvania Not Specified
Abandoned Mine Reclamation Project Bovard Area Wide Subsidence Hempfield Township, Westmoreland County Estimated Amount: Greater Than $5,000,000 Term: 630 calendar days Bid Bond Required Principal Items of Work and Approximate Quantities: Overburden Drilling and Casing, Steel or PVC, 10,203 L.F. Four-Inch (4") Air Rotary Drilling, 33,942 L.F. Furnishing and Installing Four-Inch (4") Nominal Steel or PVC Injection Casing, 32,224 L.F. Supply and Delivery, Mixing and Injection of Grout Material - Cement, 5,045 TON Supply and Delivery, Mixing and Injection of Grout Material - Fly Ash, 29,522 DRY TON Supply and Delivery, Mixing and Injection of Grout Material - Stone (AASHTO No. 57), 20 TON Supply and Delivery, Mixing and Injection of Grout Material - Sand (Type A), 17,892 DRY TON Injection Site Preparation and Site Restoration, 497 EACH READ INSTRUCTIONS CAREFULLY TO COMPLY WITH NEW GOAL-SETTING PROCEDURES. Per Attachment A of the Bid Information, the SDB/VBE Goals for this project are: SDB - 5%, VBE - 3%. If a bidder intends to meet the SDB goal in full, they must submit SDB-2, SDB-3, and SDB-3.1. If a bidder is seeking a full good faith efforts waiver (not agreeing to meet any portion of the SDB participation goal), they must submit SDB-2 and the information requested in SDB-5 (parts 1-5). If a bidder is seeking a good faith efforts waiver from a part of the SDB participation goal, they must submit SDB-2, SDB-3, SDB-3.1, and the information requested in SDB-5 (parts 1-5). Additional requirements for submitting these documents are set forth in SDB-1, Instructions for Completing the SDB Participation Submittal and SDB Utilization Schedule. Please note that the Veteran Business Enterprise program has separate but equivalent documentation requirements.
Pennsylvania Not Specified