State Contract Opportunity

Last Updated on 06 Jun 2025 at 4 AM
Colorado

North Colorado Springs Readiness Center Battery Backup and Microgrid

Details

Solicitation ID Not Specified
Posted Date 06 Jun 2025 at 4 AM
Response Date 06 Jul 2025 at 4 AM (estimated)
NAICS Category
Product Service Code
Set Aside No Set-Aside Used
Contracting Office Not Specified
Agency Government Of Colorado
Location Colorado United states

Possible Bidders

Amerisourcebergen Drug Corporation

Wayne Chesterbrook Malvern Conshohocken

Amerisourcebergen Drug Corporation

Wayne Chesterbrook Malvern Conshohocken

Exide Technologies

Salina Alpharetta Milton Aurora Lombard Fort smith Reading Pearl Manchester Columbus Kansas city Richmond

J & L America Incorporated

Southfield Livonia

Sign up to access Documents

Signup now
Point Of Contact Not Available
Design-build: work includes the design, equipment selection, permitting, bonding and installation of a battery energy storage system (bess) system capable of providing net ac peak power of at least 125 kw, a storage capacity of 400 kwh, at 480 volt, ...

Similar Opportunities

Similar Awards

Colorado springs Colorado 16 Sep 2011 at 9 PM
Colorado springs Colorado 03 Sep 2014 at 11 PM
Fort carson Colorado 17 Sep 2008 at 8 PM
Location Unknown 27 Jul 2018 at 8 PM
Location Unknown Not Specified