Sign up to access Documents
Signup now
Point Of Contact Not Available
Subject to conditions prescribed by the University of California, Los Angeles, sealed bids for a lump sum contract from prequalified bidders are invited for the following work: This project is proposed by the Clinical Lab department at Peter Morton Medical Building at 200 Medical Plaza (MP200). The project would reconfigure the existing blood draw clinic to include one additional check-in workstation, seven additional blood draw stations, one additional private blood draw room, a new supply storage area, and nine staffing workstations to support the space. The project would also include replacing the existing toilets with code-compliant facilities and replacing the staff lockers and breakroom to better serve their needs. The proposed scope of work includes the demolition of existing workstations, offices, and support rooms to accommodate the new program; modifications to building mechanical, plumbing and electrical systems to support the program; modifications to the fire alarm system and fire sprinkler system impacted by the work; installation of conduit and cabling for telephone, data and security systems; casework; testing and balancing; and upgrades to the building finishes in the area of work. The work shall be in an occupied building and be completed in a sequence of 4 phases to allow continuous, if reduced, operation of the clinic. Dust control and safety barriers shall be installed per the specifications. Short term containment shall be included to separate the construction space from adjacent occupied areas. The work shall be during off-hours Monday thru Friday, 7:00 p.m. to 4:00 a.m., as approved by the University Representative. TO VIEW AND DOWNLOAD ALL FURTHER INFORMATION (PREQUALIFICATION DOCUMENTS IF ANY; BIDDING DOCUMENTS; ADDENDA IF ANY; CONFERENCE/JOB WALK SIGN-IN SHEET; PLANHOLDERS LIST; PREQUALIFIED BIDDERS, IF ANY, ETC.), CLICK HERE: UCLA ONLINE PLANROOM