Sign up to access Documents
Signup now
Contractors are invited to bid on the Justin Smith Morrill Homestead Drainage Modifications Project, located at 214 Justin Morrill Memorial Highway in Strafford, Vermont. This project consists of, but is not limited to, control of water intrusion into the House and to address crucial damage caused by excessive water-related conditions to the foundation and structure. The project approach is multi-method: reduce the downslope flow of surface water reaching the House; effectively direct high ground water away from the foundation; collect and channel roof run-off; and install affirmative drainage surrounding the foundation.