Federal Contract Opportunity

Last Updated on 27 Aug 2024 at 2 PM
Solicitation
Ohio

Government Requirement for Advanced Power and Energy (GRAPE)

Details

Solicitation ID FA8650-18-S-5008
Posted Date 27 Aug 2024 at 2 PM
Response Date 02 May 2026 at 4 AM (estimated)
NAICS Category
Product Service Code
Set Aside No Set-Aside Used
Contracting Office Fa8650 Usaf Afmc Afrl Pzl Afrl/pzl
Agency Department Of Defense
Location Ohio United states

Sign up to access Documents

Signup now

To employ new battery-based electric flightline support equipment and vehicles, charging infrastructure must be installed. A Phase 1 Flightline Electrification Charging Infrastructure Study was conducted at Holloman AFB and Robins AFB to prepare the government for a Phase 2 Demonstration at these sites.


The purpose of the Phase 2 Demonstration effort is to install charging infrastructure and conduct a demonstration at these sites to define charging standards, operational approaches, technologies, and risks. This learning will enable a smoother and faster transition to a future Phase 3 wide-spread implementation effort.