Only M&R MACC Contractors listed on the General Requirements cover page may submit a proposal for this ROICC Camp Lejeune area of responsibility project. See attached documents for scope of work and any applicable drawings.
The facility/activity will remain in operation during the entire construction period. The Contractor shall
conduct his operations to cause the least possible interference with normal operations of the
facility/activity.