Sign up to access Documents
Signup now
Base Bid - Portion of Hortonville Rd -5,420 lf – Asphalt Paving From Shrewsbury Town line (at end of existing asphalt) to a point at the VELCO ROW(at end of existing asphalt). This section of roadway was previously reclaimed in 2021 and is gravel surface. See attached maps (page 4 & 5) for limits. Alternate 1 – Hortonville and Shunpike Rd Intersection – 10,800 sf – Shim and Overlay Paving At the intersection of Hortonville Road and Shunpike Road to the limits shown on the attached map (page 4 & 6)