Sign up to access Documents
Signup now
General work will convert two (2) existing barrack buildings into operational facilities for 3 tier levels of command. These buildings in general are referred as ?the Hammer Heads?. The Hammer Handles have three (3) floors with a crawl space at grade elevation. The Hammer Heads are single floor. The Basement area with a main utility mechanical and electrical room extends partially under both the Hammer Head and the Hammer Handle.The definitive removal / demolition work items for each building will require: Hazardous material / debris abatement and removal mostly within the crawl space, Partial at ~ 75% removal / demolition of exterior building envelope, interior walls, etc, Removal at ~ 90% removal of building mechanical ? electrical systems, Removal of the existing roof EPDM system (but not the roof framing structure)The definitive repair / new work items for each building will require: New exterior envelope, few building mechanical ? electrical systems, New roof TPO system Other considerations for site work coordination, New utility connections (mostly by other entities), and Shared construction boundaries with adjacent current and future projects.