Point Of Contact Not Available
Complete demolition of 1990s classroom/library addition and detached gym; Interior demolition of 1956 building down to structure; Renovation of existing south classroom wing for Grades 1–4 and Auditorium to remain as community asset; New single-story construction to include Pre-K, Kindergarten, 5th Grade, Special Education, Ancillary Classrooms, Gym, Dining, Kitchen, Media Center, and Administration spaces; Secured entry vestibule, accessible circulation upgrades, and repurposed courtyard as outdoor learning space for Art program. Site improvements include accessible ramps, updated fire lanes, new drainage and detention systems, and utility infrastructure upgrades; Landscape, irrigation, and hardscape enhancements at all street frontages; Life-cycle upgrades including full mechanical system replacement, new domestic water heating, complete sprinkler system, and updated lighting and finishes. Target enrollment capacity: 750 students. All digital files included with purchase of complete printed set via file transfer. Specs separated by section and plans by sheet names. Half Size Available upon Request NOTICE: INVITATION TO BID BUDGET: Total for Bid # $ 43,164,283 SCOPE: Complete demolition of 1990s classroom/library addition and detached gym; Interior demolition of 1956 building down to structure; Renovation of existing south classroom wing for Grades 1–4 and Auditorium to remain as community asset; New single-story construction to include Pre-K, Kindergarten, 5th Grade, Special Education, Ancillary Classrooms, Gym, Dining, Kitchen, Media Center, and Administration spaces; Secured entry vestibule, accessible circulation upgrades, and repurposed courtyard as outdoor learning space for Art program. Site improvements include accessible ramps, updated fire lanes, new drainage and detention systems, and utility infrastructure upgrades; Landscape, irrigation, and hardscape enhancements at all street frontages; Life-cycle upgrades including full mechanical system replacement, new domestic water heating, complete sprinkler system, and updated lighting and finishes. Target enrollment capacity: 750 students Construction is expected to begin 10/01/25 and be substantially complete in the 08/15/27 and ready for the Fall semester in August 2027. PRE-BID DATE: A pre-proposal meeting will be held at 11 a.m. CST on 07/08/25, at the Maudrie Walton ES, 5816 Ricken Backer Pl, Fort Worth Texas 76112, for all interested parties. Please allow 15 minutes before the meeting to check in at the front desk administration office, and will be escorted to the meeting location. This meeting is not mandatory, but the information discussed will be very helpful in preparing the proposal. Any questions asked and answered during the meeting will be available through the electronic bid system. All 2021 Capital Improvement construction procurement responses must be submitted electronically through the electronic bid system. That system can be found at https://fwisd.ionwave.net/. BID DATE: Completed CSP Package Parts 1-A, 1-B, and 1-C must be submitted through IonWave no later than 07/22/25, before 3PM (CST). Any materials received after the respective closing date/times will not be considered. The District will open and read the names of the proposers and prices submitted in responsive CSPs, 07/22/25 at 3 P.M. upon submittal of Part 1-A, 1-B, and 1-C of the Package, at the Fort Worth ISD Central Administration Building, at 7060 Camp Bowie, Fort Worth, TX 76116. No further information will be publicly released until after the date the Agenda is publicized for the Board of Education meeting. The right is reserved to reject any or all bids, proposals, CSPs, or statements of qualification and to waive technicalities. The Fort Worth Independent School District is committed to the ideals of equal opportunity in all its business endeavors. Owner: Fort Worth Independent school district Capital Improvement Program 7060 Camp Bowie Blvd. For Worth, TX 76116 Program Manager Firm: PROCEDEO 200 Bailey Ave. Suite 201 Fort Worth, TX 76107 A/E Firm Name: KAI DESIGN Address: 5010 RIVERSIDE DRIVE SUITE 250 IRVING, TEXAS 75039 Main Contact: CATHERINE DALTON Email:
[email protected] BID METHOD: Competitive Sealed Proposals