Federal Contract Opportunity

Last Updated on 18 Jun 2025 at 7 PM
Special Notice
Fort belvoir Virginia

DRAFT Statement of Work- Fort Belvoir Roofing SATOC IDIQ

Details

Solicitation ID W5168W-24-R-0022
Posted Date 18 Jun 2025 at 7 PM
Response Date 30 Jan 2026 at 5 AM (estimated)
NAICS Category
Product Service Code
Set Aside 8(a) Set-Aside (FAR 19.8)
Contracting Office W6qm Micc-fdo Ft Sam Houston
Agency Department Of Defense
Location Fort belvoir Virginia United states

Possible Bidders

Miscellaneous Foreign Contractors

Frankfurt am main Isando Washington Arlington

Miscellaneous Foreign Awardees

Ciudad de mexico Toronto, ontario Bertrange Arlington Madrid Washington St lo Kampala

Sign up to access Documents

Signup now

This is a construction-roofing requirement which entails furnishing all labor, equipment, and materials to perform roof removal, installation, repair, sealing and or replacement to buildings at Ft Belvoir, VA as needed to include incidental work in accordance with the specifications of the statement of work (SOW). Work performed by the contractor shall result in a complete, functional, and suitable system.

___________________________________________________________

Update as of 18 JUN 2025: At this time, the Government continues to work through the processes required before posting the solicitation. The official solicitation is forthcoming.

___________________________________________________________

Update as of 7 APR 2025: At this time, the Government continues to work through the processes required before posting the solicitation. The official solicitation is forthcoming.

____________________________________________________________

Update as of 6 MAR 2025: At this time, the Government continues to work through the processes required before posting the solicitation. The official solicitation is forthcoming.

____________________________________________________________

Update as of 31 JAN 2025: At this time, the Government continues to work through the processes required before posting the solicitation. The official solicitation is forthcoming. Please be advised that two URLs in the Statement of Work have been updated to the following: https://stg.wbdg.org/dod/ufgs (Unified Facilities Guide Specifications (UFGS)) and  https://www.nibs.org/wbdg/ffc-dod (Unified Facilities Criteria (UFC)). Please continue to monitor Sam.gov for updates.

___________________________________________________________

Update as of 17 JAN 2025: At this time, the Government continues to work through the processes required before posting the solicitation. The official solicitation is forthcoming. Please continue to monitor Sam.gov for updates.

_______________________________________________________________

Update as of 31 DEC 2024: At this time, the Government continues to work through the processes required before posting the solicitation. The official solicitation is forthcoming. Please continue to monitor Sam.gov for updates.

________________________________________________________________

Update as of 26 NOV 2024: At this time the Government continues to work through the processes required before posting the solicitation. The ID number for this requirement has changed from W5168W-24-R-0022 to W5168W-25-R-0026. The official solicitation is forthcoming. Please continue to monitor Sam.gov for updates.

_______________________________________________________________

Update as 7 NOV 2024: The Government has answered all questions submitted by industry in response to the Site Visit held on 9 OCT 2024. The Q&A has been uploaded in the Attachments section of this posting.

________________________________________________________________

Update as of 7 NOV 2024: At this time the Government is finalizing the RFP for the Ft. Belvoir Roofing SATOC/IDIQ. It is the Government’s intent to release the RFP on or about December 2024. Please continue to monitor Sam.gov for updates.

_________________________________________________________________

Update as of 23 OCT 2024: At this time the Government is finalizing the RFP for the Ft. Belvoir Roofing SATOC/IDIQ. It is the Government’s intent to release the RFP on or about December 2024. Please continue to monitor Sam.gov for updates.

__________________________________________________________________

As of 23 September 2024, the Government intends to publish a DRAFT Statement of Work. This Draft Statement of Work is for informational purposes only and may be updated at the Government's discretion.

The official solicitation is forthcoming.

Similar Opportunities

Fort belvoir Virginia 30 Jan 2026 at 5 AM (estimated)
Fort belvoir Virginia 30 Jan 2026 at 5 AM (estimated)
Fort belvoir Virginia 30 Jan 2026 at 5 AM (estimated)
Fort belvoir Virginia 30 Jan 2026 at 5 AM (estimated)
Fort knox Kentucky 31 Jul 2025 at 5 PM

Similar Awards

Sparta Wisconsin Not Specified
Location Unknown 21 Sep 2012 at 9 PM
Location Unknown 06 Sep 2011 at 6 PM
Minot air force base North dakota 12 May 2009 at 4 PM
Location Unknown 14 Nov 2008 at 7 PM