THIS NOTICE IS NOT A REQUEST FOR PROPOSAL. VENDORS SHOULD NOT SUBMIT FORMAL PROPOSALS UNTIL THE REQUEST FOR PROPOSAL (RFP) IS POSTED TO THIS WEBSITE. PROJECT NO./TITLE: 675-25-108, Design-Build (DB) Services, Replace Galvanized Domestic Water Lines at Orlando VA Healthcare System The Department of Veteran Affairs (VA), Veterans Integrated Service Network (VISN) 8 has a requirement to provide construction services to include labor, materials, tools, equipment, supervision, and all other resources necessary for the construction of all the elements to Replace Galvanized Domestic Water Lines at Lake Baldwin in accordance with the Statement of Work (SOW) and other specifications. Work Location: Department of Veterans Affairs, Orlando VA Healthcare System, 5201 Raymond Street, Orlando FL 32803. Estimated Target Completion Period: 170 calendar days after issuance of the Notice to Proceed. In accordance with FAR 36.204 (c), the magnitude of construction is between $100,000 and $250,000. North American Industry Classification System (NAICS) 237110 Water and Sewer Line and Related Structures Construction. Size Standard is $45.0 Million. Product Service Code (PSC) S114 Utilities Water This is a Design-build project/solicitation that will use trade-off source selection process, providing the best value to the Government. There will only be one phase. The solicitation will be issued on or about June 18, 2025. All information for this solicitation will be posted on the SAM.gov website at SAM.gov. At the time of proposal submission, all interested firms must have current registration in the System for Award Management (SAM) www.sam.gov . Proposals of contractors not registered in www.sam.gov will not be considered for award. Service Disable Veteran Owned Small Businesses will be verified in Veteran Small Business Certification (VetCert) at www.veterans.certify.sba.gov. Green Environmental Management System (GEMS) - Contractors selected for award of this contract are expected to be good stewards of the environment by complying with federal, state, and local environmental laws and other requirements such as medical center policy and project specifications. In addition, contractors should incorporate pollution prevention and waste minimization into operations. Point of Contact: Michael Zorzi, Contract Specialist Email: michael.zorzi@va,gov, and Elizabeth Romero, Contracting Officer Email:
[email protected], Network Contracting Office (NCO) 8, Construction Team 3. See attached document: S02 - Attachment 1 Draft Statement of Work SOW