Sign up to access Documents
Signup now
Contractor shall furnish all labor, equipment, tools, parts, vehicles, permits, licenses, equipment, travel, and incidentals necessary to provide electrical, mechanical, and controller circuits on 10 overhead shop cranes and auxiliary components: three (3) stationary lifts, and 13 mobile lifts. Contractor shall also perform quarterly and annual inspections on each crane and certify each crane is safe to operate to Caltrans.