The work is located on Cotta Road Bridge (Bridge No. 29C-292/Bridge No. 29C-471) over Upland Canal, east of N. Guard Road. The work, in general, consists of demolishing the existing bridge (Bridge No. 29C-292), constructing a new 2-lane structure (Bridge No. 29C-471) with necessary appurtenances, reconstructing approach roadways to conform with the new concrete structure, conforming driveways, and placing rock slope protection in the canal. The DBE Contract goal is 21 percent Base Estimate Range Between $2,256,769 and $2,758,274