Federal Contract Opportunity

Last Updated on 30 Jun 2025 at 1 PM
Special Notice
Texarkana Texas

Component Rebuild Shop, Red River Army Depot (RRAD)

Details

Solicitation ID W9126G26RA009
Posted Date 30 Jun 2025 at 1 PM
Response Date 10 Jul 2025 at 7 PM
NAICS Category
Product Service Code
Set Aside No Set-Aside Used
Contracting Office W076 Endist Ft Worth
Agency Department Of Defense
Location Texarkana Texas United states 75507

Possible Bidders

National Industries For The Blind

Wayne Earth city Alexandria

Officemax Incorporated

Nashville Charlotte Williston Chesapeake Edwardsville Phoenix Garden grove Naperville Selma Houston Louisville Boise Alexandria Cleveland Hampton Itasca Boca raton Columbus Billerica Menlo park Saint louis Salt lake city Waipahu Warren Orlando Elkridge Carolina Brentwood Maple grove Aurora Pittsburgh Bristol Kent Portland Smyrna Carlstadt Garland

L C Industries Incorporated

Hazlehurst Daytona beach Durham

Sign up to access Documents

Signup now

The Corps of Engineers Fort Worth District is soliciting comments from the construction community addressing the potential use of Project Labor Agreements (PLAs) from large scale construction projects (exceeding $35 million). This market survey is being posted for the construction of the FY26 Component Rebuild Shop at RRAD, TX.

THIS IS A PROJECT LABOR AGREEMENT SURVEY ONLY. THIS IS NOT A REQUEST FOR PROPOSAL, REQUEST FOR QUOTE, OR INVITATION FOR BID. THERE WILL NOT BE A SOLICITATION, SPECIFICATIONS, OR DRAWINGS AVAILABLE AT THIS TIME.

Background / Scope Summary:

This project includes a 215,000 square foot facility that will provide adequate space, structural capacity, infrastructure, and environmental controls to support the engine disassembly/rebuild shop, transmission disassembly/rebuild shop, machine shop, hydraulics shop, electrical accessories shop, fire bottle shop, axle shop, dynamometer shop (engine and transmission test cells), component cleaning, metal finishing/component painting, radiator shop, and composites shop. The new facility will consolidate component rebuild processes resulting in more efficient flow of materials and better process control.

Please provide your comments via e-mail to the Contract Specialist, Mr. Emmanuel Hardrick at [email protected] and courtesy copy the Contracting Officer, Matthew S. Dickson at [email protected] no later than 2:00 p.m., 10 July 2025.