Point Of Contact Not Available
S&L Underground Inc. is requesting subcontractor bids and material quotes from all qualified subcontractors and suppliers including MBE, WBE, SBE and DBE for the following: Project Name: City of Thompson Falls, Montana- Wastewater System Improvements Phase 3 & 4 Bid Date: July 31, 2025 Bid Time: 2:00 pm local time Plans are available at: Quest CDN #9767717 Project description: The project involves the installation of approximately 32,000 linear feet of new gravity sewer main, connecting approximately 350 services (including both gravity and grinder pump services) and abandoning approximately 300 existing septic tanks. It also includes approximately 3,500 linear feet of new sewer force main, a triplex grinder pump lift station with a backup generator, as well as two new packaged submersible lift stations, each with a backup generator. Additionally, the project entails roughly 6,000 linear feet of low-pressure sewer main, rehabilitation of the existing main lift station inclusive of the demolition of the current dry well and the restoration of the wet well to convert to a submersible lift station. Areas of work include: traffic control, piping and appurtenances, valves, concrete, manholes, aggregate, etc. Please verify your intent to provide a quotation to
[email protected] and respond by July 30, 2025 with your proposals. Thank you for your time and consideration. Closing Date: Thursday, July 31, 2025 Organization: S&L Underground Inc. Point of Contact:
[email protected]