Sign up to access Documents
Signup now
The Project includes the installation of concrete baffle walls within the cistern and removal/repair of existing caulk joints and replacement with new caulk. New joint prep and joint caulking. Repairs to spalled concrete areas after cleaning and removal of reinforcing steel corrosion.